Specifications include, but are not limited to: Furnish all labor, material, tools, equipment and inclusive of all hardware, software and other items associated with access control, video surveillance systems, fire alarm systems, security alarm systems, and any other equipment, that supports or falls under the Solid Waste Authority’s physical safety and security equipment. Additionally, the awarded Proposer shall provide as-built drawings upon completion of all individual projects. 2. The Proposer must be able to provide the following: skilled labor for physical security equipment design, layout, and installation. The Authority’s expectation is that the selected Proposer will provide accurate and detailed workmanship along with a timely manner of completion of projects assigned.