1. Pre-Engineered Metal Building (PEMB) Provide complete design, engineering, and permitting for a 2,080 sq. ft. PEMB. Coordinate dimensions with the existing site layout (approx. 80’ x 26’ footprint). o Building is to include 2 – 36’ access doors; 1 -8’ rollup door, 4 – 4’x4’ windows, and building must be R-16 insulated (see concept for location placement) Including slab thickness, wind load rating, anchoring, and hurricane code compliance (Building must meet local wind codes) with pre-engineered building. Submit building plans to the Florida State Fire Marshal for approval prior to fabrication. Integrate allowances for future interior layout and utilities (layout provided post-shell completion). 2. Site Preparation, Clearing & Grading A site survey was performed. Please see attached Remove designated trees and vegetation for the building footprint, parking areas, and loading zone. Clear, grub, and grade the building and parking areas for proper drainage. Protect existing utilities and coordinate any required relocations or adjustments. 3. Parking Areas (3 total) Construct three new parking areas (asphalt or concrete) with ADA compliance: o North: 28’ x 16’ (near loading zone) o East: 12’ x 60’ (adjacent to structure, replaces gravel parking) o South: 28’ x 28’ (along southern entrance curve) Include striping, wheel stops, proper base and sub-base per FDOT standards, and drainage. 4. Loading Zone Install 6” thick 12’x36’ concrete loading area at the north end of the building. Provide positive drainage away from the structure. 5. General Requirements All work compliance with the current Florida Building Code, FDOT Standards, and applicable permits. Maintain site access and operational status during construction (phasing plan if required). Provide final grading, sodding, and restoration of disturbed areas.