1 Mobilization 1 LS $ $ 2 Construction Surveying & Staking, including As-Built/AutoCad CD/Drawings 1 LS $ $ 3 Installation of a 12" SDR 11 HDPE Force Main Directional bores lengths determined by contractor ±1710 LF $ $ 4 Bore #1 Station ±437+00 Mandatory Bore ±110 LF $ $ 5 Bore #2 Station ±434+00 Mandatory Bore ±60 LF $ $ 6 Bore #3 Station ±427+00 to 431+00 Mandatory Bore ±400 LF $ $ 7 Bore #4 Under Retention Pond Mandatory Bore ±135 LF $ $ 8 Bore #5 Prospect Ave. Mandatory Bore ±475 LF $ $ 9 Bore #6 Sebring High School Station ±414+00 to 422+00 Mandatory Bore ±820 LF $ $ 10 Check Valve and Vault As Per City of Sebring Requirements 1 LS $ $ 11 2" Air Release Valve and Containment Cabinet 3 LS $ $ 12 12" Gate Valves W/Cast Iron Box + Concrete Slab Painted Green 4 LS $ $ 13 45 degree bends w/Mega Lug Restraints 12 LS $ $ 14 12 Gauge Solid Copper Locating Wire Double Wire For DIR. BORE ±7420 LF $ $ 15 12"x16" Wet Tap Tie In @ Lift Station 12"x16" S.S. Tapping Saddle and 12" Gate Valve W/Mega Lug 1 LS $ $ 16 Tie Into Existing FM (Gate Valve) @ Youth Care Lane 1 LS $ $ 17 De Watering/By Pass Pumping 1 LS $ $ 18 Concrete Sidewalk Removal and Replacement 25 SY $ $ 19 Fence Repair @ Lift Station Connection 1 LS $ $ 20 R/W Restoration and Sodding ends of directional bores (listed), tie ins, 45 bends 450 SY $ $