Bidder shall be responsible for all labor, materials, equipment, tools, transportation, and supplies to repair roads in Picayune Strand State Forest in accordance with the Florida Department of Transportation’s (FDOT’s) Standard Specifications for Road & Bridge Construction, Section 911. The Department has identified the following roads for repairs; Everglades Boulevard (Blvd) and 52nd Avenue (Ave) Southeast (SE). Specifically, .5 miles of Everglades Blvd, 1.17 miles of 52nd Ave SE., and the intersection for a total 1.67 miles. The project sections are connected. The project is designed to improve the existing roadbed, which was previously constructed with compacted lime rock material. For the purposes of this project any existing limerock or other aggregate will NOT contribute to the amount of aggregate needed to fulfill this project. The paved section of Everglades Blvd. that connects to the overpass, as well as the concrete bridge surface, and the paved approaches that are on 52nd Ave SE., will NOT be a part of this project. The following are provided to assist Bidders in preparing its bid.