The Project consists of the installation of approximately 3,050 LF of 6” ductile iron water main and all associated valves, fittings, water services, stub-outs, fire hydrants, blow-offs, and connections to existing water mains. Additionally, the work includes the cutting, capping and abandoning in place of 2” galvanized steel water main. Surface restoration of all impacted facilities, including asphalt roadway trench repair, milling, resurfacing, and replacing asphalt, concrete sidewalk and curbing, driveways (concrete, stone, asphalt, pavers), striping, ADA ramps, sodding, landscaping, etc. Demolition, removal and reconnection of water services and meters. Deflection of existing or proposed utilities, testing, disinfection of new pipelines and dewatering as necessary for installation of new pipe and structures and all other work as shown in the Contract Drawings.