Specifications include, but are not limited to: This project may include, but not limited to, the following Scope of Work: • Meetings/Workshops with the City to determine project scope details and design kick-off. • Design Memorandums for each of the proposed improvement processes. • Testing necessary to confirm the removal efficacy of the proposed ion exchange resin. Including, but not limited to, on-site skid testing. • Design development and submission of Schematic Level/30% complete design drawings. • Design development and submission of 60% and/or permit submittal drawings and specifications. • Apply for, and obtain, all required permits and licenses. • Design development and submission of 90% complete drawings and specifications. • Submittal of 100% complete Construction Documents.