Specifications include, but are not limited to: Ensure all utilities are disconnected and inspections are completed as required. Demolition and legal disposal of all structures described in mandatory walk-through. Obtain septic tank abandonment permit from Health Department, have tank pumped and inspected. Photograph all stages of tank abandonment. Removal and legal disposal of all nuisance conditions such as trash, debris, rubbish, items holding water or no longer being used for it’s intended purpose. Removal and legal disposal of all overgrowth. clearing along all fence rows and/or property lines. This includes all underbrush, scrub oaks, overgrowth around all trees, and perimeters of any structures. Remove and dispose of all vines on gates. Grounds to be left clean of any clippings, cuttings, sticks, or other debris, this includes walkways, sidewalks, and road way. Any ruts, holes, or uneven areas caused by contractors equipment or due to cutting and cleaning should be left smooth and even so property can be easily maintained in the future. Grade out lot after demolition.