The DEPARTMENT is preparing to remove lead-based paint from some of the steel portion of bridges. The projects require a Lead Base Paint Abatement Supervisor to monitor the removal process, the extent of the sandblasting on the bridge surface, the lead abatement procedures, and document the activities. With the following conditions: 5.1. The CONSULTANT is to review the Prime Contractor Plan and submit comments within two (2) weeks. The review of the PCP and scheduling of the field operations with the initiated following receipts of an authorization to proceed from the DEPARTMENT. 5.2. Following completion of the abatement activities, the PRIME CONTRACTOR will submit post project sampling and air monitoring data. The CONSUTLANT is to review the data and prepare a post project report to close the job. 5.2.1. The abatement SUPERVISOR or a delegate will be responsible for monitoring the application of the coating to be applied to the impacted bridge surface. This will require entering the lead containment system. 5.2.2. The PRIME CONTRACTOR will perform the pre-project sampling, ambient air monitoring, personal air monitoring and the post project sampling including analysis by a qualified laboratory. The CONSULTANT will review these results for compliance. 5.2.3. Monitor the Containment System installation accordingly to the equipment and elements indicated in the Technical Plan Notes and/or in the previous approved Shop Drawings presented by the CONTRACTOR. 5.2.4. Monitor the sandblasting operations and the effectiveness of paint removal in accordance with the Technical Plan Notes...