Specifications include, but are not limited to: OCU improvements will relocate Orange County water and wastewater facilities within the Woodbury Road corridor from Colonial Drive to South of Lake Underhill (a length of approximately 3.1 miles). OCU improvements include installation of approximately 2000 LF of 24-inch, 600 LF of 12-inch and 250 LF of 8-inch water mains. Also, the installation of 170 LF of 12-inch, 50 LF of 8-inch, 2000 LF of 6-inch and 500 LF of 4-inch force main. There will be 150 LF of 8-inch sanitary sewer and couple of manholes that will need to be constructed as part of this project. Connection of existing services will be required while maintaining service to all existing utilities customers. Coordination with OCPW to resolve all conflicts with the proposed road widening project is imperative. All water and wastewater improvements within the corridor will remain within the proposed Woodbury Road right-of-way.