Charlotte County is requesting proposals from qualified firms to provide professional design services for a firm to perform design of construction ready plans to be incorporated into the County’s bid documents and all applicable Federal, State and Local permitting and construction oversight services for the partial demolition and complete replacement/repair of the shoreline, shoreline armoring, adjacent amenities and upland walkways. It consists of approximately 1,450 foot long armored shoreline that contains various concrete seawall (precast panels with cast-in-place cap beams, blocks with cast-in-place cap beams and footers, and cast-in-place retaining walls, gravity walls and riprap designs), approximately 3,500 square foot fishing pier east, approximately 200 square foot timber pedestrian bridge, stormwater outfalls, upland walkways and sidewalks located at Bayshore Live Oak Park at 23157 Bayshore Road, Port Charlotte, FL 33980. This is a Disaster Recovery Project. **Project scope does not include playground, seawall section behind restroom building at playground, grass parking lot (east end) or West fishing pier** Elements include, but are not limited to, the following: 1. Design and Permitting Services - project initiation, data collection, preliminary design and permitting. 2. Construction Services – value engineering, costing, construction plans and specifications, and bid process requirements. 3. Construction Management – pre-construction meeting, scheduling, observation, review permits, submittals, pay applications