Specifications include, but are not limited to: a. Stake out area of work and confirm boundaries with Leon County Schools. b. Secure and control the area of the work as necessary to protect safety and welfare of the public. Means and methods for security shall be the responsibility of the Contractor. c. Locate and secure construction entrance. d. Designate Storm water Management Control Officer. Prepare storm water pollution prevention plan, and file Notice of Intent to use Permit. Install sedimentation and erosion control. Utilize best management practices from the Florida Sedimentation and Erosion Control Manual. e. Identify any trees that may be required to be removed. Coordinate with Leon County Schools before removal of any tree and adjust the area of work as requested to protect any trees LCS would like preserved. f. Clear and grub the work area and prepare for grading. g. Core-drill existing catch basin and seal inside and outside. h. Provide pipe, catch basin and necessary material to complete project. i. Install an 18” conveyance at a minimum 1% gradient with new structures having bottom invert to correspond to gradient at structure location working from existing back to new structure. j. All roof drain piping and fittings to be 3034 sewer pipe and fittings hub abd spigot type (SDR35). k. Connect rain leaders at building. l. Excavate up to building line to a depth of 24” and 30” wide and place sock drain per drawing (Attachment A). Area to be filled with #57 limerock to within 6” of grade. Finish grade (top of sod) to be 6” below finish floor. Silt screen to be placed on rock prior to back-fill.