Data Center Services: Communication links: Provide four 10Gb links from your data center to the following addresses: City Hall Data Center – 2 Links 228 S Massachusetts Ave Lakeland, FL 33801 Lakeland Electric Administration – 1 Link 501 E Lemon ST Lakeland, FL 33801 Parker Street Complex – 1 Link 605 Evelyn Ave Lakeland, Fl 33801 All provided connections should have no more than a 10ms latency round trip. Internet Provisions: Existing colocation to support 1GB from Lumen Technologies. Cloud Provider Access: • Ability to provide access to AWS Direct Connect • Ability to provide access to Microsoft ExpressRoute Rack Space: We have the following hardware that needs to be hosted: Exadata – 1 Rack VxBlock – 2 Racks VxRail – 1 Rack Communications Rack – 1 Rack Room for two additional racks to provide space for hardware replacements Power requirements: Qty 6 - AC 30A 208V Three Phase (A+B) UPS Qty 4 - 4AC 30A 208V Single Phase (A+B) UPS Total of 35 Kilowatts Power at the facility should include redundant UPS and generator backups. Hardware Migration: There are qty of 5 populated 42U racks that will need to be moved if a new facility is selected. The selected vendor will be expected to provide the following: • Inventory assessment of existing hardware • Development of a migration plan • Transportation and installation of hardware at the new location • Testing and validation of systems post migration • Documentation of the migration process