The selected Consultant shall be required to work in close cooperation and coordination with Collier County staff. The selected Consultant shall design the stormwater improvements prepare all necessary regulatory and governmental permitting, complete the bid process for all the construction phases and recommend construction contractors to execute the stormwater infrastructure replacement program. a. Attend Progress meetings with the Stormwater Project Management staff as needed. b. Attend public information meetings with Stormwater Project Management staff as needed. c. Graphics/exhibit preparation. d. Progress meeting assistance. e. Public meeting assistance. f. Project management assistance. g. Project management plan preparation. h. Public Relations assistance. i. Infrastructure preliminary design. j. Infrastructure design. k. Subsurface investigations of underground utilities. l. Geotechnical surveys. m. Land surveying. n. Permitting. o. Bid package(s). p. Refine existing designs, update bid documents, technical specifications, and cost estimates of fifteen (15) outfalls pipe replacement plans...