The work includes furnishing all labor, supervision, manpower, tools, equipment, materials, insurance, bonds, management, transportation, and performing all operations in connection with the rehabilitation of 8" through 72" gravity sanitary sewer and storm sewer lines using Cured-In-Place Pipe (CIPP) liner. The CIPP shall be continuous and joint less from structure to structure and shall be free of all defects that will affect the long-term life and operation of the pipe. All lining material shall be suitable for use in domestic sewers. Pipelines to be rehabilitated may be in backyard easements, light traffic subdivision roadways or highways requiring Maintenance of Traffic plans conforming to Florida Department of Transportation standard plans. Temporary Traffic Control plans by a professional engineer are required for work where standard index plans do not apply. Work in FDOT R/W’s that requires lane closures typically will only be allowed Sunday – Thursday 8:00 PM – 5:30 AM or as required in yet to be obtained FDOT Utility Permits. Comment by Ransom, Shannon L: Change to Temporary Traffic Control?? Comment by Smith, Arenee: Corrected