This project includes the removal of failed culvert structures and installation of replacement structures at Jacobin Street and MTWCD canal C-60. Construction of this project is all turn-key and will include all aspects of work including but not limited to: furnishing and installing all items, removal of existing failed culvert(s), furnish and installation of 80’-10’ x 6’ box culverts and endwall at the location, and furnishing and installing all associated materials items per specifications and providing needed staff, equipment, labor, to complete the construction per plans and specification. Work shall include items such as maintenance of traffic, mobilization, erosion control, clearing and grubbing, excavation, dewatering, demolition, de-mucking, disposal of unusable materials, new fill, base rock under pipe and roadway, compaction of fill, stabilization, testing, restoration of road including pavement installation, procurement furnish and installation of selected structures, utility valve installation and conflict coordination and relocations, final clean up.