Specifications include, but are not limited to: install approximately 24,000 linear feet of water main ranging in size from 4” to 24” in the Country Club Village neighborhood and along Southwest 18th Street. The project includes directional drilling with a water main installation under Interstate-95. Included with the water main replacement is abandonment of existing water mains, installation and reconnection of meters and service lines (on both public and private property), as well as roadway and sidewalk improvements. Furnishing all labor, materials, equipment, services and incidentals for all scope components are required for a complete and bacteriologically cleared system. Maintenance of water service and coordination with operations are required. All work shall comply with Contract Documents and permit conditions, and include all ancillary components, testing and restoration work as necessary.