Specifications include, but are not limited to: The CONSTRUCTION MANAGER shall provide all Preconstruction Phase Services necessary to establish a GMP as well as all Construction Phase Services following Award of the GMP. The CONSTRUCTION MANAGER shall provide services to incorporate all the requirements set forth in the Permitted Construction Documents, the Florida Building Code, Florida Fire Prevention Code, and the National Electrical Code. Construction will be a phased effort that includes selective demolition of deteriorated portions of the stair and stair structure. Site constraints will require traffic reconfigurations and pedestrian protection for egress locations. Additional site scope includes, site lighting, and signage systems. The work includes phased demolition of existing exterior stair components, metal stair/framing repair, new wall penetration protections, new steel framing, new gate / panel systems to secure lower level of stair, new metal panel systems, new industrial painting systems, new door systems, access control, flashing systems, and signage with exterior lighting. The building will remain partially occupied during construction.