Influent Structure with a mechanical screening system. A new Master Lift Station1. EQ Basin and associated mixers and EQ pump Station1. BNR Treatment System consisting of primary anoxic, aerobic, deoxygenation, and secondary anoxic basins, a common reaeration basin, and all associated BNR equipment and appurtenances. BNR blowers, air piping and diffusers. Flow metering systems. Secondary clarifier flow splitter box. Two (2) new secondary clarifiers. RAS/WAS pumping station. Chemical storage, feed and pumping systems. Tertiary Filtration (disc filter) system. Multi-compartment chlorine contact chamber (CCC). Modifications to the existing aerobic digestion system. Dechlorination structure and associated equipment. Electrical Building No. 1 and associated equipment, piping, and appurtenances. Electrical, controls, instrumentation and SCADA system improvements. Stormwater management system improvements. Site work, yard piping/valving, plant internal roadway improvements, fencing, signage, sodding, etc. Various additive and deductive bid items that may, or may not, become part of the overall project work. Note 1: These components are part of a separate grant-funded project but will be included in the scope of work of the CEI.