The intent of this contract is to secure all labor and equipment required for the Taylor County Coastal Dredging project in Taylor County, Florida. This project involves the use of hydraulic dredging technologies to remove sediment from the Keaton Beach Canal System and the Steinhatchee Boat Basin to restore original depths. Dredged material will be staged in 20 YD roll off containers with trash/sand screens as well as 20 YD roll off containers lined with woven geotextile bags for dewatering. This work includes furnishing all necessary materials, being responsible for equipment, maintaining haul routes, protection or repair of work or facilities damaged in construction, furnishing equipment, testing dredge material to determine disposal sites, and safely and legally transporting dewatered material to offsite facility. Dredged material may be disposed of at the Fish Creek Grade Spoil Deposit site or the Aucilla Class 1 Landfill located at 1313 SW Greenville Hill’s Rd, Greenville, FL 32331 depending on results of Toxicity Characteristic Leaching Procedure sampling.