Specifications include, but are not limited to: 1.0 Boardwalk a. Provide narrative on the benefits of providing a boardwalk, encompassing approximately 2,000 feet in length along the Central Winds Park shoreline, that is resilient to Lake Jessup seasonal highs. Integrate connectivity of boardwalk along the passive area of Central Winds Parks’ shoreline, Cross Seminole Trail, CWP Nature Trail, Hicks Avenue, Central Winds Parkway, and Orange Avenue, considering existing spaces such as the Pickleball Court, Dog Park, and Lower Fields. 2.0 Environmental & Sustainability Considerations a. Identify environmentally sensitive areas and determine sustainable mitigation measures to protect and preserve such areas. b. Develop narrative of the history and growth of the park pertaining to environmentally sensitive areas, habitats, and tree species. Provide education resource suggestions regarding value of the same. c. Identify natural and cultural resource protection to include, but not be limited to, species identification, nesting areas, seasonal high water level, monuments, etc. 3.0 Additional Amenities a. Provide narrative for feasibility and benefits of proposing a lodge/event center within park. b. Provide an assessment of existing facility conditions within Central Winds Park and identify improvement opportunities. c. Identify and determine feasibility and benefits of identifying frisbee golf and other activity areas for year-round or seasonal recreational activity. d. Provide narrative identifying concession location(s) within passive area and benefits of the same. e. Provide options for seating accommodations for Amphitheater area. 4.0 Implementation Strategy a. Five and ten-year implementation strategy 5.0 Maps, Plans, and Renderings a. Concept, landscape, lighting, transportation, and 2016 Central Winds Master Plan Update b. Signage Plan for wayfinding, accessibility, and education c. Renderings of projects