Specifications include, but are not limited to: Quantity Allowance: Include 529 Cu.Yd. of rock removal and replacement with satisfactory soil Material as specified in Section 312000 "Earth Moving." Coordinate quantity allowance adjustment with unit-price requirements in Section 012200 "Unit Prices." Lump-Sum Allowance: Include the sum of $111,927.00 for Johnson Controls Inc. Security and Building Controls for card key access controls, video camera systems, Code Blue Emergency Telephone system, and Metysys HVAC controls. Quantity Allowance: Include $45,000 for Florida Power & Light three phase power service and overhead line upgrades. Quantity Allowance: Include $35,000 for design, permitting, drilling, testing and connection of the new irrigation well.