7/13/23 - Updated Notice Title/Description and added Secondary POC.
All interested offerors are requested to complete the attached sources sought information form, 1 pg.
The Contracting Officer will review the responses in order to determine the set-aside type.
Submit the form to the Contracting Office POC(s) listed in this notice.
Project Description/Summary:
1. Installation of Security Upgrade which includes CCTV, Aiphone along with an Intrusion Detection
System (IDS) and Access Control System (ACS/PIV Readers). The new CCTV system will be
connected to CBP’s existing LAN equipment. The Contractor shall provide and install all Electrical
related systems Wiring, Conduit, Switches, Outlets & NEMA 1900 Boxes, Power Panelboard in
compliance with CBP 2018 LPOE Design Standards. The Contractor shall patch and repair to
original condition all areas affected in the installation of the security devices for this project.
2. See attached Sources Sought (SS) Information Form, SOW (draft) and/or project documents, which may include the specifications and/or drawings.
3. Architect: The project was designed by: TTV Architects, Inc.
4. Project Delivery Method: Traditional. Design-Bid-Build.
All interested offerors are requested to complete the attached sources sought information form,
1 pg. The Contracting Officer will review the responses in order to determine the set-aside type.
Submit the form to the Contracting Office POC(s) listed in this notice.