Specifications include, but are not limited to: x The Contractor shall access the area around the structure with small to medium sized track equipment capable of removing or reposition Redi-Rock blocks that may weigh in excess of one ton. Equipment must not damage or impair blocks that are to remain in place. Care must be taken not to damage or remove large amounts of vegetation near the structure while operating the equipment. Work must not damage or cause further erosion issues so leaving as much grass, trees, and bushes as possible are imperative. Equipment may access the structure from the east and south. x The Contractor shall remove Redi-Rock blocks and create a level walking path from the top of the structure to the river. Along this path, the Contractor shall install Vyna-Grip following manufactures’ requirements.