The Work is generally described as furnishing all labor, materials, equipment, tools, transportation, services and incidentals necessary to provide the Owner with the following project elements: • Resurface asphalt 100’ by 132’ for outdoor basketball court. • The entire court will be covered with an acrylic surface. • Install 4 basketball goals. Basketball goals shall Fixed Height regulation-sized acrylic basketball backboard, (42 inches tall and 72 inches wide) with Breakaway goal or a substitute approved by the City. • Stripe court with professional standard basketball markings. • Final color selection to be approved by City of New Port Richey • Site to be restored to include any concrete, asphalt, or sod placement