Specifications include, but are not limited to: • Assessment of the existing systems and consult with staff about existing inadequate concerns. • Removal of existing equipment and handed over to the Okeechobee County Facilities Maintenance Department. • Cleaning all duck work and ventilation. • Furnish and replace existing units with TRANE equipment. • Furnish and install UV Filtration System. • Assessment and balancing / calibration. • Prepare all permitting documents and acquire permits required for Construction. • Preparation of design, construction plans and cost estimates. Including the most energy efficient equipment options and upgrades necessary to ensure system energy efficiency. • Remove existing insulation, furnish, and install with open-cell foam insulation to the bottom of the existing roof decking. • Conduct startup and onsite training with operations staff. • Provide the County with Manuals and necessary product documentation.