Specifications include, but are not limited to: The “Airline Ticket Office and Baggage Handling System Expansion – Phase 1” work shall include the renovation and expansion of the Airline Ticket Offices (ATO) and the construction of a new outbound Baggage Handling System (BHS). The BHS work will consist of ticket counter conveyors, transport conveyors, a slope-plate make-up unit, and maintenance catwalk. The ATO work will include renovation and new construction of walls, ceilings, flooring, finishes, millwork, plumbing, mechanical HVAC, electrical, access control, CCTV, and a structural steel canopy with an exterior metal framed, perforated tensioned fabric screening system to cover the new BHS and related work. The project also includes site work that will include clearing and grubbing, miscellaneous demolition, new concrete foundations and slabs, asphalt road construction, site lighting, drainage, excavation and embankment, pavement marking, fencing, site access control, site CCTV, landscaping/irrigation, a temporary office trailer, a backup generator and related work. The “Central Energy Plant Replacement” work shall include the replacement of two (2) air-cooled chillers, primary and secondary chilled water pumps, and HVAC controls modifications. The existing hot water heating system boiler shall be replaced with two (2) high efficiency condensing boilers. The hot water distribution pumps will be replaced with variable speed pumps to match the increased capacity of the boilers.