5.1. Limerock Material A. All materials supplied shall be in compliance with the Florida Department of Transportation Standard Specifications for Road and Bridge Construction, current edition. B. It will be the responsibility of the Entities to have the limerock tested. If found not meeting the current Florida Department of Transportation specifications, the Entities reserve the right to cancel the contract. C. A representative sample will be taken at the discretion of the Entities. The average moisture content will be used in establishing the actual tonnage delivered and shall cover ten days deliveries on which the sample is taken. 5.2. Limerock Delivery A. The limerock is to be delivered to either the Public Works Department or when stipulated, shall be delivered to the job site or storage area located within one of the 4 zones at any point inside the County. B. Limerock to be delivered by truck and dumped by the supplier. C. The limerock is to be delivered within time frame specified at time of order. Any limerock not delivered within this period of time may be purchased on the open market and any increase in cost will be charged to the supplier. D. It will be the responsibility of the supplier to have each load showing net weight and signed for by an employee of the Entities. A copy of the delivery ticket must be given to signee. E. The billing shall be by the day with a copy of the signed delivery tickets attached supporting all deliveries listed on a given invoice. F. If, in the opinion of the Entities, the material is so wet that dumping it on a road would present a safety hazard, the Entities may reject the load at no cost to the Entities.