The City of St. Petersburg is seeking a qualified Contractor for installation of a new stormwater conveyance system along 7th Street North and 50th Avenue North in St. Petersburg, Florida. Major components include reinforced concrete pipe in varying sizes (18"–54"), and 8'x5' concrete box culvert to improve drainage capacity. The work also includes roadway and sidewalk reconstruction—new curbs, pavement, traffic signage, and striping—and the installation of pre-manufactured “Hydroplanter” systems for water quality treatment. All work must comply with applicable environmental and permitting requirements from the Southwest Florida Water Management District (SWFWMD), U.S. Army Corps of Engineers, and the Pinellas County Water and Navigation Control Authority. Restoration work will follow utility installation and must be performed in accordance with City of St. Petersburg standards.