Specifications include, but are not limited to: Structure Descriptions: 1.) Demo IN PLACE Approximate 1,979 sq. ft. – 1997 Single Family Residence. 2.) Remove the Volleyball Net Located in the Back Yard. 3.) Remove Wood Gated Entry at the Front of the Property, and the Wood Side Gate to the Right of the Pool. Leave the Chain Link Fence Along the North and South of the Property. 4.) Remove Swimming Pool, Pool Pump, Pool Cage and Pool Deck. 5.) Remove ALL Concrete, Except for Concrete Drive Apron. 6.) Do Not Crush Septic Tank. Pump Out and Remove Septic Tank and Drain Field in accordance with Florida Administrative Code Chapter 64E-6.011 and 64E-6.019. 7.) Include a photo of the removed septic tank on the transport to the dump site or shown out of the ground. 8.) Remove all Debris. Fill Level and Rake upon Completion. Photos available upon request. Description: WINTERSET LANDINGS PB 99 PGS 5 & 6 LOT 1 Utilities: Demo Contractor is responsible for all disconnects and permits with any and all utilities, municipalities, etc. Electricity must be disconnected from the structure prior to start. Must have required permit(s) prior to start. PLEASE NOTE: The County has requested that Tampa Electric remove the meter and disconnect service to this property. However, it is still the Contractor’s responsibility to verity the disconnect. Demolition: Demolition in place – Structure as described above and removal of all debris. Demolition services must be provided utilizing the “wet demo” method regardless of the presence of hazardous material. Must demo per NESHAP Recommendations, asbestos survey available upon request. If asbestos material is present, a State licensed Asbestos Contractor must perform the work in accordance with established guidelines for the type of material present.