All pump stations and lift stations shall be under the responsible charge of a state licensed wastewater facility operator, or a certified wastewater collection/transmission system operator (University of Florida TREEO or similar training course by a certified environmental trainer), or manufacturer trained and certified technician ("Certified Collections Systems Operator"). Contractor shall provide an operator who is licensed by the State of Florida in Wastewater Operations (minimum Class "C") or a Certified Collections System operator to visit each wastewater lift station as frequently as necessary to preclude wastewater lift station failure, but in no event less than one ( 1) time per month (each site should be scheduled for a 30-day cycle) and perform the following operational and maintenance checks. Once a month the Contractor shall ensure that the following maintenance is performed: A. Remove and dispose of any debris from the surface of the pump station or lift station wet well that may interfere with the operation of the pump station or lift station. B. Log hour meter reading for all pumps. C. Run each pump manually through a cycle and record amp draw in the maintenance log. D. Record voltage at control panel source in the maintenance log. E. Cycle alarms. F. Confirm floats are properlyset. G. Confirm floats are clear of grease and clean if any grease present