Specifications include, but are not limited to: Demolition services must be provided utilizing a “wet demo” method regardless of the presence of hazardous material. If asbestos material is present, a State licensed Asbestos Contractor must perform the work in accordance with established guidelines for the type of material present. Removal of asbestos containing material must be performed by a contractor holding a State of Florida Contractor’s license, licensure type CJC. The Contractor shall remove all debris, trash, man-made items, or building material from site. All utility poles, unless they are marked that they are owned by a utility company; or located in a right-of-way, must be removed. All signs of human habitation should be removed at the completion of the demolition.