Emergency Watershed Protection for Wilson Road and Long Eddy Road in Ludlow Twp., Washington County, Ohio
ATTENTION FOR SITE VISIT INFORMATION: Coordinates for site visit location Lat = 39.569059 Lon = -81.175143
The requirement is for stream bank stabilization for Wilson Run Road and Long Eddy Road in Washington County, Ohio which consists of 541 CY of Wire Mesh Gabions; 53.5 TONS of Type C Grouted Rock Riprap; 114 TONS of Type C Rock Riprap; and 476 TONS of Drainfill (ODOT #57).
Set-aside: Total Small Business
A bid guarantee shall be 20% of the bid price or $3 Million, whichever is less.
Estimated magnitude for this Firm-Fixed Price construction contract is between $250,000 and $500,000.
A Firm-Fixed Price construction contract is anticipated. Performance time is 23 calendar days from Notice to Proceed (NTP) from the date the contractor acknowledges the Notice to Proceed.
Pursuant to FAR 36.211(b), information regarding USDA’s definitization of equitable adjustments for change orders under construction contracts may be found at Contracting with USDA | USDA. USDA’s procedures that apply to the definitization of equitable adjustments for change orders under construction contracts may be found in the USDA Contracting Desk Book, located at Policies & Regulations | USDA, under Parts 436 and 443.