This is a Sources Sought Notice ONLY.
The Department of State (DOS) has requirements for the design of an interior intruder anti-climb fence with a lockable pedestrian gate to augment the NE section of the existing wall at U.S Embassy Lisbon, Portugal. The scope of work (SOW) identifies the specific requirements for the performance of the Architectural-Engineer (A/E) services. The Designer will, in accordance with the terms and conditions set forth below, furnish all labor, management, facilities, supplies, equipment and material and all required services necessary for the performance of the work. The Designer will provide the required services and furnish to the U.S. Government (USG) drawings, specifications and other data with supporting material developed during the period of service as described in the requirements below.