The Contractor shall provide the following services and complete the work by June 5, 2025. 1) Replacement of existing carpet per Attachment J.1. The carpet shall be installed in the areas noted in the attachment. The carpet shall be installed underneath the existing stacks and not cut around them. If the Contractor opts to remove all books from the shelves to perform the work, it is expected that books will be re-shelved in Dewey Decimal order by the Contractor. No substitutes are allowed. 2) Replacement of cork flooring with carpet per Attachment J.1. The carpet shall be installed in the areas as noted in the attachment. The cork flooring shall be removed and discarded. The carpet shall be installed underneath the existing stacks and not cut around them. If the Contractor opts to remove all books from the shelves to perform the work, it is expected that books will be re-shelved in Dewey Decimal order by the Contractor. No substitutes are allowed. 3) Painting on the first and second floor. Paint colors and areas to be painted are noted in Attachment J.2. No substitutes are allowed.