The Coolidge Auditorium in the Thomas Jefferson Building was constructed in 1925, designed specifically for chamber music. A facility renovation in 1997 introduced standard definition broadcast cameras to the venue. These cameras are currently powered off and have been out of use for more than a decade. The Library is seeking to replace these cameras and their functionality with current technology. At present all cameras – ENG, full-frame cinema, and robotic – in the Multi Media Group (MMG) fleet are manufactured by Sony. This allows for interoperability within the MMG workflow. For a project completed during calendar year 2024 in the James Madison Building, MMG has installed Sony FR7 Robotic Cameras and control systems. Removal and installation tasks will be conducted by Library staff.
The contractor shall provide robotic cameras with lenses, mounts, controllers, and required accessories.
See attached solicitation and Attachments J-1 - J-3 for more information and offer submission instructions.
Amendment 0001 answers Offeror questions, revises Sections C&F, extends the due date, and adds an attachment. Please see 030ADV25Q0190 0001 and new Attachment J-4 for more information.
Amendment 0002 answers an additional Offeror question. See revised Attachment J-4. The due date remains 08/18/2025 at 12 PM Noon EDT.