Specifications include, but are not limited to: Relocate approximately 70 Utility poles with 34,500 volt, 3 phase, one or two 12470 volt, 3 phase and single phase 7200 volt circuits attached. Poles also have transformers, capacitor banks, secondary triplex, streetlight arms and brackets, smart meter radios, fused cutouts, single disconnects and 3 phase gang switches attached as noted on drawings which need relocation. Contractor to set 38 new utility poles and relocate all equipment. Contractor to schedule all outages on all secondary risers as needed to allow the existing underground cables to be rerouted to the new poles. Contractor to relocate all primary underground cables and reroute to risers on new poles.