Specifications include, but are not limited to: The Project consists of the the replacement of the incoming water service to the building, including the creation of a new water meter closet within the building. A. Scope of demolition and removal work is shown on drawings and specified in Section 02 41 00. B. Scope of alterations and new construction work is shown on drawings and specified herein. C. Renovate the following areas, complete including operational mechanical and electrical work and finishes: 1. Room 014. D. Plumbing: Replace existing system with new construction, keeping existing in operation until ready for changeover. E. HVAC: Replace existing system with new construction, keeping existing in operation until ready for changeover. F. Electrical Power and Lighting: Alter existing system and add new construction, keeping existing in operation.