Specifications include, but are not limited to: Project includes removal of two sets of drinking fountains on the third floor and installation of six new sets of ADA compliant drinking fountains (two each on the first, second, and third floors). Modifications include removal and salvage of existing lockers, partial removal of ceilings, bulkheads, and first floor slab to allow access for installation and routing of new electrical, plumbing supply, venting, and sanitary connections. Drinking fountains will be located in new alcoves with new plumbing chases constructed with CMU and gypsum clad metal stud walls and bulkheads. Disturbed areas to be patched and finished to match adjacent surfaces. The project work is located at the existing Christina School District, Bayard School located at 200 South DuPont Street, Wilmington, DE 19805.