Specifications include, but are not limited to: The Work consists of the removal of asbestos-containing materials as listed on Tables 1 and 2 of these specifications and shown on the drawings. The work also requires the Contractor to complete all break-in points through out the buildings to inspect within ceilings, walls and floors. Also, the work involves removal of pipe coverings, debris and soil from all crawlspaces. Work areas are shown on the drawings for work described in this specification. The work also includes the removal of assumed asbestos-containing materials which were inaccessible during the asbestos building inspection. The work also requires the removal of non-asbestos-containing building materials to access asbestos-containing materials. This work is being performed in preparation for renovation of the building. All asbestos-containing materials and assumed asbestos-containing materials must be removed on this project.