DIVISION 02 EXISTING CONDITIONS 02 41 19 SELECTIVE DEMOLITION DIVISION 07 THERMAL AND MOISTURE PROTECTION 07 84 13 HVAC & PLUMBING PENETRATION FIRESTOPPING DIVISION 22 PLUMBING 22 05 00 COMMON WORK RESULTS FOR PLUMBING 22 05 05 PLUMBING PIPING FITTINGS AND VALVES 22 07 01 PLUMBING INSULATION 22 40 05 PLUMBING EQUIPMENT DIVISION 23 HEATING VENTILATING AND AIR CONDITIONING 23 05 00 COMMON WORK RESULTS FOR HVAC 23 05 05 HVAC PIPING, FITTING AND VALVES 23 05 48 VIBRATION CONTROLS FOR HVAC AND PLUMBING EQUIPMENT 23 05 93 TESTING, ADJUSTING & BALANCING FOR HVAC AND PLUMBING 23 06 00 HEATING, VENTILATING, AND AIR CONDITIONING EQUIPMENT 23 07 01 HVAC INSULATION 23 09 00 INSTRUMENTATION AND CONTROLS OF HVAC & PLUMBING SYSTEMS 23 65 15 CLOSED CIRCUIT EVAPORATIVE FLUID COOLERS 23 65 17 OPEN-CIRCUIT, LOW PROFILE, FORCED DRAFT COOLING TOWERS DIVISION 26 ELECTRICAL 26 05 00 COMMON WORK RESULTS FOR ELECTRICAL 26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 26 05 20 ELECTRIC HEATING CABLES 26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 26 05 28 FIRESTOPPING FOR ELECTRICAL SYSTEMS 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 26 05 33.23 SURFACE RACEWAYS FOR ELECTRICAL SYSTEMS