Project involves the interior renovation and addition to the existing Office of the President located at the DTCC Terry Campus; Caulking/Painting; Provide all exterior and interior painting including the preparation of new and existing surfaces to receive the new paint. Provide the sanding, cleaning and painting of all exterior lintels, and other metals. Provide all epoxy, high performance coatings, painting, concrete sealer paint and exposed ceiling painting including the preparation of the areas to receive painting. Painters option to apply finish coat of paint after all finishes are installed or be responsible for ALL touch up necessary. Provide all caulking that is required where casework meets walls, floors or ceilings if required. Also provide caulking of drywall trim/block interface as noted on the reveal details on the project documents. Provide caulking at all trims, moldings.