Specifications include, but are not limited to: Examine the existing site and determine that the proposed improvements can be executed. Coordinate with Owner, all areas of site that are available for the work to be completed including staging areas, demolition and construction debris removal, and electrical power for construction equipment, water and temporary portable toilets if needed. Demolition and removal of all existing site and building structures required to install all proposed improvements. All demolition debris shall be removed from the site by the contractor. Temporary shoring of all existing structures to remain in place during construction. Protection of all existing portions of the building to remain including weather protection such as tarps and temporary drainage piping and/or structures to prevent silt runoff into existing storm systems.