Specifications include, but are not limited to: A. Meet with Town’s track committee to review and acquire necessary information regarding the use and current condition of the track. B. Prepare a base map to be used as a basis of the project design. C. Prepare a report describing various track surface options and provide recommendations. D. Assist the committee with track surface selection. E. Prepare a schematic design illustrating the track layout including lane striping, event markings and improvements to the “D” areas. F. Prepare construction cost estimate(s). G. Prepare final plans and technical specifications ; . Perform inspections of all construction work as performed by all contractors. B. Provide all testing and sampling of materials as may be necessary. All testing to be performed by a NIST-NVLAP accredited testing agency. C. Maintain ongoing revisions of the project plans with a final facility “asbuilt” to be provided to the Town at project completion.