Specifications include, but are not limited to: The scope will be separated into 2 distinct phases, Phase 1 will include an existing conditions report that provides an analysis of existing air ventilation within the school. This analysis must be completed by May 14, 2020, it will provide information to the EGBC and assist them in selecting one of the two options. Phase 2 will include the design for either Option One or Option Two, both of which will require the design for a new 800-amp Main Distribution Panel to be installed next to the existing Panel which will be removed after the new panel is energized. This project must be ready for full operation by August 22, 2020. The design, where applicable, will include a controls interface compatible with the existing BMS Controls system. In addition, the selected Design Firm will be responsible for applying for any utility energy conservation incentives, if available, that will benefit the Town or Board of Education.