Specifications include, but are not limited to: The Suffield Public School invites proposals from experienced architectural firms to provide full architectural services for a band room addition to the Suffield Middle School. A conceptual plan has been completed to date. As indicated on the attached plan diagram, the project scope includes a new 3000 sf band room, a new exterior entrance, limited renovation and reconfiguration to two existing classrooms and required revisions to the existing paved walkway connecting the rear parking lot with the school’s front sidewalk. The project construction budget (exclusive of FF&E costs) is $1.8m. Based on the approved plan diagram, firms shall provide full architectural services including: Architectural Engineering (mep, structural, civil) I.T. Survey Geotech AV FF&E Cost Estimate (at end of the SD Phase) Project development and approval will require interface with the Town’s Permanent Building Committee, along with presentations to the Board of Education facilities subcommittee and full Board of Education. Scope should also include presentation and approval at a Town Meeting (if required).