Specifications include, but are not limited to: 0010 0201001 CLEARING AND GRUBBING LUMP SUM _______________.____ 1.000 _______________.____ 0020 0202000 EARTH EXCAVATION c.y. 970.000 _______________.____ _______________.____ 0030 0202100 ROCK EXCAVATION c.y. 50.000 _______________.____ _______________.____ 0040 0202216 EXCAVATION AND REUSE OF EXISTING CHANNEL BOTTOM MATERIAL ** See Special Provisions ** c.y. 38.000 _______________.____ _______________.____ 0050 0202501 CUT CONCRETE PAVEMENT l.f. 34.000 _______________.____ _______________.____ 0060 0202502 REMOVAL OF CONCRETE PAVEMENT s.y. 660.000 _______________.____ _______________.____ 0070 0202529 CUT BITUMINOUS CONCRETE PAVEMENT l.f. 145.000 _______________.____ _______________.____ 0080 0203000 STRUCTURE EXCAVATION - EARTH (COMPLETE) c.y. 860.000 _______________.____ _______________.____ 0090 0204151 HANDLING WATER ** See Special Provisions ** LUMP SUM _______________.____ 1.000 _______________.____ 0100 0209001 FORMATION OF SUBGRADE s.y. 1,455.000 _______________.____ _______________.____ 0110 0210306 TURBIDITY CONTROL CURTAINS ** See Special Provisions ** l.f. 90.000