Specifications include, but are not limited to:1. Project is for the Renovations of the North Campus Townhouses (162 Units) in two phases. 2. Removal/Replacement of existing tubs, toilets, and sink/vanities. (Tubs to be replaced with fiberglass shower units.) 3. Removal of existing ceramic tile floor, Replacement with vinyl flooring a. Allowance for “Remove and Replace water damaged subfloor and infill at some existing bathtub locations.” 4. Removal/Replacement of existing Kitchen cabinets & countertops. 5. Removal/Replacement of appliances by contractor – appliance cost, except for hood, to be fixed in a separate Owner generated appliance subcontract between supplier and GC. a. Removal/Replacement/Installation of Kitchen Hood with ductwork - Labor & material part of General Contract, including hood itself.. b. Removal/Replacement/Installation of Range and Refrigerator – labor part of General Contract. Cost of Range and Refrigerator to be fixed in Owner generated subcontract between Supplier and contractor, and is to be included in the bid.