Specifications include, but are not limited to: The Contractor will be required to furnish all routine maintenance equipment as required below, including oil and gas for all equipment. The successful Contractor must have the following equipment: - a tractor equipped to pull a 72” over seeder and an aerator, and with a bucket on the tractor - a dump truck capacity to meet contract requirements - trailer sufficient to move 15’ bleachers, soccer goals, and picnic tables - backhoe - landscape grooming equipment with the following attachments: aerator, infield groomer (renovator), rake, and front plow - 3-point hitch post hole digger - sod cutter - skid steer - backpack blowers - chain saws and power pole saw - power trimmers - plate compactor SPRING PREPARATION OF ALL ATHLETIC FACILITIES All baseball, softball, T-ball, soccer. This includes and shall not be limited to the following services; rototilling of all infields, baselines, edge cutting of all infields and base paths, rebuilding of all pitcher’s mounds and home plate areas, rolling of all infields and outfields, liming, filling low areas in the infields and outfields, installation of pitcher’s plate, home plate, bases, backstops (plastic), safety fencing (plastic) and other related work to ensure daily safe and playable athletic facilities. - Deliver marking lime, rakes, shovels, etc. to all aluminum boxes. - Move all bleachers as required. - Check flagpole at Judge Crandall. - Distribute aluminum boxes. - Placement of trash cans, player benches, and picnic table. - Spread loam/clay/sand/or beam clay. - Fields to be laid out per league requirements. - All fields to be rolled prior to spring play. - Repair of all bleachers, player benches and picnic tables. - Install soccer and lacrosse goals and paint the fields.