Specifications include, but are not limited to: 1. Survey and Data Collection: The firm shall complete a topographic and right-of-way survey using acceptable engineering standards. The topographic survey shall include all physical structures and elevations. Property line information shall be depicted on the maps and physical evidence of those property lines shall be collected in the field. All utility information collected from the Town and utility companies and all utility companies and supplemented by physical evidence in the field shall be shown on the maps for this project. 2. Preliminary Design: Using the information depicted on the maps, the firm shall provide a preliminary layout of the proposed sidewalks. The design shall minimize the impact on individual properties and the need to relocate utilities, while meeting generally accepted engineering standards for sidewalk design and being fully ADA complaint. The design shall be coordinated with existing crossings, if necessary.