Specifications include, but are not limited to:The contractor is responsible to remove & replace all flooring and subfloor, strengthen floor joists, install new floor covering, base & trim. Remove and replace existing acoustical ceiling & grid, remove and replace ceiling insulation w R-19 Fiberglas batt, replace lights with LED fixtures. Remove and replace existing windows with vinyl replacement, replace interior walls and repair framing as needed, trim, caulk and paint interior. Remove existing shingles, (remove & replace sheathing, were needed), install new ice and water a tall edges, drip edge, repair soffits. Replace siding with Hardboard siding. Work to be reviewed at the time of project walk through with Director of Facilities with any associated notes at that time